Key points:After the cargo arrives at the port of loading, our on‑site tally staff will check whether the quantity and model are consistent with the cargo loading list;
Timely communication: keep records and notify the client as soon as possible;
Keep records: If the number of cargo is found to be wrong, the cargo surface is unusual (eg. dirty marks or stains, etc.), our staff will make records promptly and clean them outside the port;
Maintenance and handling: Carry out maintenance and handling promptly according to the clients' requirements and instructions;
Binding operation: During the reinforcement process on board, carefully inspect and ensure that each reinforcing steel wire rope is wrapped in soft cloth at the contact part with the equipment to prevent friction between the steel wire rope and the equipment, and to avoid scratching the paint.